Latest Projects
Project |11
Sonangol Block-3 Offshore (2022-Present)
Role: Senior Surveyor and Piping Designer (Ponticelli Angola)
Country: Angola
Client: Sonangol
Scope of Work: ​​
-
Work under Offshore preparation Manager as a dimensional Control Surveyor and piping designer.
-
Liaising with client engineer`s to survey anomalies both for piping and structural, produce & issue fabrication piping isometrics and structural drawings for engineering to review and approval.
-
Assist to shut down coordinator for preparation of shut down work packs.
Project |10
Various Projects (2019-2022)
Role: Survey Coordinator of Kazakhstan and Azerbaijan Ops.
(Laser Gulf Eng.)
Country: Kazakhstan, Azerbaijan
Client: TCO, PSNK, KCOI, Denholm Zholdas, Worley Parsons, BP, Wood, Socar, Azfen, PD&MS.
Scope of Work:
Coordination of Survey Team. (over 40 Surveyors.)​​
-
Liaise with the client through all phases of the project, ensuring that all of the client requirements are being met.
-
Maintain close collaboration with the company’s Engineering Department to meet the Survey requirements arising from the work in that department.
-
Monitor, report and action any Survey equipment that requires maintenance/calibration.
-
Monitor and action the equipment required for each project. Organizing manifests, custom clearances as necessary.
-
Raise and issue ‘Yellow cards’ and Non Conformance Reports when the requirements of ISO 9001 are not met.
-
Liaise with other departments and client focal points with regard to the issue of information they may require, in a timely manner.
-
Attend all Departmental and Management meetings, following up any actions required by the Survey department.
-
Liaise closely with the Accounts Department to monitor the progress both physical and financial on projects.








Kraken FPSO Project (2014-2017)
Role: Dimensional Control Head of Department. (Scopus Eng.)
On behalf of Client 3rd Party Verification Dimensional Surveys.
Country: Singapore, Indonesia.
Client: EnQuest (British)
Project Cost: 1.3 Billion US$.
Scope of Work:
Manage Survey Team. (10 Surveyors.)
-
​Turret Critical Dimension As-Built Survey. (Fit-up / Post Weld.)
-
Hull & Topside Design Model Clash Check.
-
Hull Full As-Built Survey. (Mod. Stools, all obstructs, etc.)
-
Module As-Built Survey.
-
Module Installation Clash Checks.
-
3D Laser Scan.










Project |09
Knarr FPSO Project (2012-2014)
Role: Dimensional Control Head of Department. (Scopus Eng.)
On behalf of Client 3rd Party Verification Dimensional Surveys.
Country: South Korea.
Client: BG Norge (Norwegians)
Project Cost: 1 Billion US$.
Scope of Work:
Manage Survey Team. (14 Surveyors.)
-
​Turret Critical Dimension As-Built Survey. (Fit-up / Post Weld.)
-
Hull & Topside Design Model Clash Check.
-
Hull Full As-Built Survey. (Mod. Stools, all obstructs, etc.)
-
Module As-Built Survey.
-
Module Installation Clash Checks.
-
3D Laser Scan.














Project |08
Project |07














Various Projects (2011-2012)
Role: Deputy Country Manager. (Scopus Eng.)
Country: Baku/Azerbaijan.
Clients: BP, Amec, KCA, SDL.
Project Cost: Various.
Scope of Work:
Manage onshore/Offshore Survey Team . (20 Surveyors.)
-
​Schedule and implement the workscope in conjunction with the Project Engineer and the designated responsible surveyor.
-
Check/sign off survey reductions and computations on completion of the work.
-
Check/sign off drawings received by client which incorporate Scopus survey results; “drawing verification checks”.
-
Transmit Formal Report/Deliverables to Client via Clients advised delivery address.
-
Carry out technical reviews of final survey documents for quality, completeness and deliverable compliance prior to issue to client.


















Peregrino FPSO Project (2009-2011)
Role: Dimensional Control Senior Surveyor. (Scopus Eng.)
On behalf of Client 3rd Party Verification Dimensional Surveys.
Country: Singapore.
Client: Maersk (Danish)
Project Cost: 1 Billion US$.
Scope of Work:
Under Lead Surveyor Manage Survey Team onsite. (12 Surveyors.)
-
​Turret Critical Dimension As-Built Survey. (Fit-up / Post Weld.)
-
Hull & Topside Design Model Clash Check.
-
Hull Full As-Built Survey. (Mod. Stools, all obstructs, etc.)
-
Module As-Built Survey.
-
Module Installation Clash Checks.
-
3D Laser Scan.
Project |06






Cascade FPSO Project Turret Fab. (2010)
Role: Dimensional Control Senior Surveyor. (Scopus Eng.)
On behalf of Client 3rd Party Verification Dimensional Surveys.
Country: Indonesia.
Client: APL (Norwegians)
Project Cost: 150M US$.
Scope of Work:
Manage Survey Team. (3 Surveyors.)
-
Day-To-Day dimension control of Critical Dimensions before/after welding, machining and Report to Client.
Project |05






Bokor Offshore Platform Upgrade Project
(2008-2009)
Role: Dimensional Control Senior Surveyor. (Scopus Eng.)
On behalf of Client 3rd Party Verification Dimensional Surveys.
Country: Malaysia.
Client: Schlumberger (American)
Project Cost: 50M US$.
Scope of Work:
Manage Survey Team. (4 Surveyors.)
-
Day To Day dimension control of over Thousand Spools Fabrication before/after welding and Report to Client.
Project |04
Various Onshore / Offshore Projects (2007-2008)
Role: Dimensional Control Surveyor. (Scopus Eng.)
On behalf of Client 3rd Party Verification Dimensional Surveys.
Countries: Azerbaijan, UK, United Arab Emirates, Malaysia.
Clients: BP, Shell, Amec, Talisman Energy, Slumberger.
Project Cost: Various.
Scope of Work:
-
Plan the work in conjunction with the Project Engineer and the Survey Co-ordinator.
-
Prepare the equipment and documentation required for the work and obtain any required additional information required.
-
Obtain permits to work as required.
-
Execute the survey in accordance with the detailed requirements.
-
Carry out computations from the field data.
-
Generate final dimensional survey drawings or, where required, pass dimensional sketches to a draughtsman for final drawing.
-
Pass survey computations and drawings to the Survey Co-ordinator/Lead Surveyor for checking.
Project |03


















PCWU Platform Project (2005-2007)
ATA Consortium (Amec-Tekfen-Azfen)
Role: Site Dimensional Control Senior Surveyor. (Tekfen Construction)
Country: Azerbaijan.
Client: AIOC-BP
Project Cost: 500M US$.
Scope of Work:
-
Plan the work in conjunction with the Project Engineer and the Survey Co-ordinator.
-
Prepare the equipment and documentation required for the work and obtain any required additional information required.
-
Obtain permits to work as required.
-
Execute the survey in accordance with the detailed requirements.
-
Carry out computations from the field data.
-
Generate final dimensional survey drawings or, where required, pass dimensional sketches to a draughtsman for final drawing.
-
Pass survey computations and drawings to the Survey Co-ordinator/Lead Surveyor for checking.
Project |02
Project |01
CWP Platform Project (2003-2005)
ATA Consortium (Amec-Tekfen-Azfen)
Role: Site Dimensional Control Surveyor. (Tekfen Construction)
Country: Azerbaijan.
Client: AIOC-BP
Project Cost: 350M US$.
Scope of Work:
-
Plan the work in conjunction with the Project Engineer and the Survey Co-ordinator.
-
Prepare the equipment and documentation required for the work and obtain any required additional information required.
-
Obtain permits to work as required.
-
Execute the survey in accordance with the detailed requirements.
-
Carry out computations from the field data.
-
Generate final dimensional survey drawings or, where required, pass dimensional sketches to a draughtsman for final drawing.
-
Pass survey computations and drawings to the Survey Co-ordinator/Lead Surveyor for checking.
-
Weekly Basics Platform Settlement Survey.
-
Platform Main Frame Structural Survey.
-
Equipments Supports/Stools Survey.
-
Equipments As-built Survey.
-
Big Size Piping Supports Survey.
-
Flare Tower Survey.
-
Crane Pedestal Survey.
-
Compressor/Generator Stools Machining Surveys.
-
Fabrication Survey of 60M Long Bridge between two platforms.